ICC 2021 IECC Residential Energy Inspector/Plans Examiner Quiz 4


Home Next Quiz

1) What is the maximum manufacturer's air leakage designation allowed for air handlers? (R403.3.4.1)

2) For a rough-in duct test where the air handler is installed, what is the maximum total leakage allowed? (R403.3.6)

3) For a postconstruction duct test, what is the maximum total leakage allowed? (R403.3.6)

4) For ducts and air handlers located entirely within the building thermal envelope, what is the maximum total leakage allowed? (R403.3.6)

5) What restriction applies to building framing cavities regarding duct systems? (R403.3.7)

6) What minimum R-value is required for mechanical system piping carrying fluids greater than 105°F or less than 55°F? (R403.4)

7) What is prohibited for protecting piping insulation exposed to weather? (R403.4.1)

8) What is required for controls of circulating hot water system pumps? (R403.5.1.1)

9) What is the maximum temperature allowed for water entering cold water piping from a hot water recirculation system? (R403.5.1.1)

10) For which pipes is hot water pipe insulation with an R-value of not less than R-3 NOT required? (R403.5.2)

11) In which climate zones are dwelling units required to be provided with a heat or energy recovery ventilation system? (R403.6.1)

12) What is the minimum sensible heat recovery efficiency required for heat recovery or energy recovery ventilation systems in Climate Zones 7 and 8? (R403.6.1)

13) What minimum fan efficacy is required for HRV, ERV, or balanced ventilation systems? (Table R403.6.2)

14) What minimum fan efficacy is required for range hood ventilation systems? (Table R403.6.2)

15) What minimum fan efficacy is required for in-line supply or exhaust fans? (Table R403.6.2)

16) Which of the following is exempt from mechanical ventilation testing requirements? (R403.6.3)

17) What standard should be used for sizing heating and cooling equipment? (R403.7)

18) What systems are required to comply with Sections C403 and C404 of the International Energy Conservation Code—Commercial Provisions? (R403.8)

19) At what pavement temperature must snow and ice-melting systems automatically shut off? (R403.9)

20) What control feature is required for heaters for pools and spas? (R403.10.1)

21) What is NOT allowed for gas-fired pool or spa heaters? (R403.10.1)

22) What is required for outdoor heated pools and outdoor permanent spas? (R403.10.3)

23) Under what condition are covers not required for outdoor heated pools? (R403.10.3)

24) What standard controls the energy consumption of electric-powered portable spas? (R403.11)

25) What standard controls the energy consumption of residential swimming pools and permanent residential spas? (R403.12)

26) What type of lighting sources must be used in permanently installed lighting fixtures (excluding kitchen appliance lighting fixtures)? (R404.1)

27) Which of the following is NOT exempt from the exterior lighting requirements for residential buildings per Section C405.5? (R404.1.1)

28) What requirement applies to fuel gas lighting systems? (R404.1.2)

29) Which permanently installed lighting fixtures must be controlled with either a dimmer, an occupant sensor, or other built-in control? (R404.2)

30) What control requirement applies when the total permanently installed exterior lighting power is greater than 30 watts? (R404.3)

31) What is the maximum override time allowed for exterior lighting controls before returning to automatic operation? (R404.3)

32) What component in Table R402.4.1.1 requires both the junction of the top plate and top of exterior walls to be sealed and knee walls to be sealed? (Table R402.4.1.1)

33) For air barrier criteria at recessed lighting, what code section is referenced for air sealing requirements? (Table R402.4.1.1)

34) What are Class I vapor retarders prohibited from being used as on below-grade walls? (Table R402.4.1.1)

35) What is the installation requirement for batts in narrow cavities? (Table R402.4.1.1)

36) What is the minimum depth of insulation covering recessed light fixtures installed in the building thermal envelope? (Table R402.4.1.1)

37) During building air leakage testing, what should be done with exterior or interior terminations for continuous ventilation systems? (R402.4.1.2)

38) What is the standard pressure at which building air leakage testing must be reported? (R402.4.1.2)

39) In Climate Zones 0, 1, and 2, what is the maximum air leakage rate allowed when complying with Section R401.2.1? (R402.4.1.3)

40) Which of the following is an exception to the requirement that rooms containing fuel-burning appliances be located outside the building thermal envelope or enclosed in an isolated room? (R402.4.4)

41) For ductwork to be considered in conditioned space when in ventilated attic spaces, what is the maximum allowed duct leakage? (R403.3.2)

42) What pressure differential is used when testing ducts for air leakage? (R403.3.5)

43) What is the minimum R-value required for the combustion air duct insulation where it passes through conditioned space? (R402.4.4)

44) What is the minimum static pressure at which fan efficacy for fully ducted HRV, ERC, balanced, and in-line fans must be determined? (R403.6.2)

45) What is the minimum static pressure at which fan efficacy for ducted range hoods, bathroom, and utility room fans must be determined? (R403.6.2)

46) What is the minimum efficacy requirement for exhaust fans with an airflow rate of 90 CFM or greater? (Table R403.6.2)

47) What is the minimum efficacy requirement for exhaust fans with an airflow rate less than 90 CFM? (Table R403.6.2)

48) What code or standard is referenced for calculation of building loads for equipment sizing? (R403.7)

49) At what outdoor temperature must snow and ice-melting system controls allow shutoff? (R403.9)

50) How should recessed luminaires installed in the building thermal envelope be sealed? (R402.4.5)

51) Which of the following air barrier criteria does NOT apply to windows, skylights, and doors according to Table R402.4.1.1? (Table R402.4.1.1)

52) What does the air barrier criteria for general requirements specify? (Table R402.4.1.1)

53) What is the insulation installation criteria for air-permeable insulation? (Table R402.4.1.1)

54) For the air barrier criteria at electrical/phone boxes on exterior walls, what options are provided? (Table R402.4.1.1)

55) According to the air barrier criteria, what must be done with HVAC register boots that penetrate the building thermal envelope? (Table R402.4.1.1)

56) How should concealed fire sprinklers be sealed according to Table R402.4.1.1? (Table R402.4.1.1)

57) What is prohibited for sealing voids between fire sprinkler cover plates and walls or ceilings? (Table R402.4.1.1)

58) What requirements apply to floors with cantilevered floors and floors above garages for air barrier criteria? (Table R402.4.1.1)

59) What is the insulation installation criteria for floor framing cavity insulation? (Table R402.4.1.1)

60) What is the minimum capability required for calculation software tools used for energy code compliance regarding the standard reference design? (R405.5.1)

61) According to the IECC, performance analysis tools must be capable of calculating the annual energy consumption of which of the following? (R405.5.1)

62) When calculating whole-building sizing for heating and cooling equipment in the standard reference design, compliance with which section is required? (R405.5.1)

63) What must be included in the code official inspection checklist required by calculation software tools? (R405.5.1)

64) When calculations require input values not specified by Sections R402, R403, R404, and R405, where should those input values be taken from? (R405.5.3)

65) What is required for compliance based on the Energy Rating Index (ERI)? (R406.2)

66) When on-site renewable energy is not included for ERI analysis compliance, what is the maximum building thermal envelope UA allowed compared to the prescriptive UA? (R406.3.1)

67) What is the maximum area-weighted fenestration SHGC permitted in Climate Zones 0 through 3 when on-site renewables are not included in the ERI analysis? (R406.3.1)

68) When on-site renewable energy is included for compliance using the ERI analysis, what levels of efficiency must the building thermal envelope meet? (R406.3.2)

69) For compliance purposes, what is the maximum percentage of total energy use reduction that can be associated with on-site renewable energy in the rated design? (R406.4)

70) What is the maximum Energy Rating Index (ERI) value allowed for compliance in Climate Zone 3? (R406.5)

71) Who must verify compliance with Section R406 as outlined in Sections R406.5 and R406.7? (R406.6)

72) Which standard must software tools used for determining ERI comply with? (R406.7.1)

73) What must be included in the compliance report submitted with the application for a building permit? (R406.7.2.1)

74) When a site-specific report is not generated for the ERI compliance report, on what basis shall the proposed design be based? (R406.7.2.1)

75) What documentation is required when on-site renewable energy is included in the calculation of an ERI? (R406.7.3)