ICC 2021 IECC Residential Energy Inspector/Plans Examiner Quiz 5


Home

1) Under the tropical climate region compliance path, what percentage of energy for service water heating must be supplied by renewable energy sources? (R407.2)

2) In the tropical climate region, what is the maximum SHGC required for glazing in conditioned spaces? (R407.2)

3) In the tropical climate region, what is the minimum ventilation area required for operable fenestration as a percentage of the floor area in each room? (R407.2)

4) For the enhanced envelope performance option under additional efficiency package options, what percentage of the total UA resulting from Table R402.1.2 must the building thermal envelope UA not exceed? (R408.2.1)

5) Under the more efficient HVAC equipment performance option, what is the minimum AFUE required for a natural gas furnace? (R408.2.2)

6) Under the reduced energy use in service water-heating option, what is the minimum EF required for a fossil fuel service water-heating system? (R408.2.3)

7) For the more efficient duct thermal distribution system option, which of the following meets compliance requirements? (R408.2.4)

8) Under the improved air sealing and efficient ventilation system option, what is the maximum measured air leakage rate allowed? (R408.2.5)

9) For the improved air sealing and efficient ventilation system option, what is the minimum Sensible Recovery Efficiency (SRE) required for an HRV or ERV? (R408.2.5)

10) Which of the following is NOT considered a "repair" according to the IECC? (R504.2)

11) When an unconditioned space is altered to become a conditioned space, it shall comply with which section of the code? (R502.2)

12) What is the minimum required solar-ready zone area for new townhouses three stories or less in height with a total floor area of 1,800 square feet? (RB103.3)

13) A building owner wants to make alterations to a historic building. When are the provisions of the energy code NOT mandatory for historic buildings? (R501.6)

14) What is the minimum width requirement for areas within the solar-ready zone? (RB103.3)

15) What shall be indicated on construction documents for solar-ready provisions? (RB103.2)

16) When a space is converted to a dwelling unit from another use, what is permitted when using the simulated performance option? (R505.1)

17) Which of the following is exempt from the solar-ready provisions? (RB103.1)

18) What are alterations to existing buildings required to comply with? (R503.1)

19) For the board of appeals, how many members constitute a quorum? (RA101.5.2)

20) What is the minimum required solar-ready zone area for new one-family dwellings? (RB103.3)

21) When replacement fenestration is installed, what requirements must it meet? (R503.1.1.1)

22) How long must an appellant wait to file an appeal after a notice is served? (RA101.2)

23) Which of the following is NOT an exception to the requirement that building envelope assemblies comply with new construction requirements during alterations? (R503.1.1)

24) When is a capped roof penetration sleeve required for solar-ready provisions? (RB103.6)

25) What is the minimum inside diameter requirement for a capped roof penetration sleeve in the solar-ready provisions? (RB103.6)

26) How should the main electrical service panel be prepared for future solar electric installation? (RB103.9)

27) What must be done when existing ceiling, wall, or floor cavities are exposed during construction? (R503.1.1, Exception 2)

28) Under which condition can an addition comply with the energy code? (R502.1)

29) What is the purpose of the interconnection pathway requirement in solar-ready provisions? (RB103.8)

30) Which of the following is a requirement for replacement materials in existing buildings? (R501.5)

31) What are the requirements for new lighting systems that are part of an alteration? (R503.1.4)

32) What is exempt from compliance with Section R503.1.4 regarding lighting alterations? (R503.1.4)

33) What is the setback requirement for the solar-ready zone from any object that could cause shading? (RB103.5)

34) What documentation regarding roof load must be included for solar-ready provisions? (RB103.7)

35) Which of the following is NOT considered an alteration under the IECC? (R503.1)

36) What happens to unaltered portions of an existing building when an addition is made? (R502.1)

37) What must be placed near the electrical distribution panel regarding solar-ready provisions? (RB103.10)

38) Where should the reserved space for future solar electric installation be positioned in the main electrical panel? (RB103.9)

39) What is the minimum area requirement for sections within the solar-ready zone? (RB103.3)

40) When are HVAC ducts newly installed as part of an addition required to comply with Section R403? (R502.3.2)

41) What is the exception to the requirement that HVAC ducts comply with Section R403 when newly installed as part of an addition? (R502.3.2)

42) What is the exception to the requirement that new envelope assemblies comply with Section R402.4.1.2? (R502.3.1)

43) What criteria must be met for a solar-ready zone regarding obstructions? (RB103.4)

44) Under what condition is a space exempt from the solar-ready provisions due to shading? (RB103.1)

45) What must happen when some or all of an existing fenestration unit is replaced? (R503.1.1.1)

46) What is an alternative compliance path for replacement fenestration when more than one unit is installed? (R503.1.1.1)

47) What is the board of appeals NOT authorized to do? (RA101.2.1)

48) What are the qualifications for board of appeals members? (RA101.3.1)

49) How many members shall the board of appeals consist of? (RA101.3)

50) What is the voting requirement for the board of appeals to modify or reverse a decision of the code official? (RA101.7)

51) What is the timeframe for the board of appeals to meet after filing an appeal? (RA101.5)

52) What is the timeline for filing a board decision after it is made? (RA101.7.1)

53) What is required when a roof is reroofed and the sheathing or insulation is exposed? (R503.1.1, Exception 5)

54) What is the compliance requirement for new service hot water systems that are part of an addition? (R502.3.3)

55) What is the maximum Energy Rating Index including adjusted OPP required for compliance in all climate zones according to Appendix RC? (Table RC102.2)

56) In Appendix RC, what is the maximum Energy Rating Index not including OPP for Climate Zone 1? (Table RC102.2)

57) What is a requirement for the code official related to a board of appeals? (RA101.3)

58) When can alterations to existing buildings be exempt from complying with the requirements for new construction? (R503.1.1)

59) What is the purpose of the board of appeals according to the IECC? (RA101.1)

60) Which of the following energy uses is included in the scope of the total building performance analysis? (R405.1)

61) According to Section R405.2, what must the annual energy cost of the proposed design be compared to the standard reference design? (R405.2)

62) What source energy multiplier shall be used for electricity when substituting source energy for energy cost? (R405.2)

63) What information is NOT required to be included in the compliance report submitted with the application for building permit? (R405.3.2.1)

64) What must the building thermal envelope of the proposed design be compared to? (R405.2)

65) What is the source energy multiplier for fuels other than electricity? (R405.2)

66) When a site-specific report is not generated, what must the proposed design be based on? (R405.3.2.1)

67) What must be documented in the certificate indicating compliance with Section R405.2? (R405.3.2.1)

68) According to Section R405.4.1, how should the standard reference design and proposed design be configured and analyzed? (R405.4.1)

69) Which of the following is required to be included in the compliance report for certificate of occupancy when on-site renewable energy systems are installed? (R405.3.2.2)