1) Previously used construction materials can be used for new construction if (104.9.1)?
2) Alternative materials and methods can be used if (104.11[2])?
3) An application requires what information (105.3)?
4) A building permit becomes invalid after how many days if work is not commenced (105.5)?
5) How many sets of construction documents are required in the submittal for a permit (107.1)?
6) One set of construction documents shall be (107.3.1)?
7) Owner designates the registered design professional and the substitute. The building official must be (107.3.4)?
8) The construction documents shall list the deferred submittals by the (107.3.4.1)?
9) The deferred submittal items shall not be installed until the deferred submittal documents have been approved by (107.3.4.1)?
10) The building official must retain one set of approved construction document for a period of not less than (107.5)?
11) At the time the permit application is submitted, who is responsible to provide an estimated permit value of the work (109.3)?
12) The final building permit valuation shall be set by the (109.3)?
13) A building used for assembly with an occupant load under 50 people shall be classified as a (303.1.1)?
14) A room or space used for assembly purposes with an occupant load under 50 persons accessory to another occupancy shall either be classified as a Group B or (303.1.2)?
15) What kind of occupancy is a 1,000 square foot tutoring center (304.1)?
16) What kind of occupancy is a production site that does sash and door manufacturing (306.2)?
17) The aggregate clear width of a mall shall not be less than (402.8.1.1)?
18) MOE for an anchor building shall be (402.8.4.1)?
19) Who is required to approve the location of the fire command center if one is necessary (403.4.6)?
20) What is the maximum distance of travel within a hospital sleeping room [not located in a care suite] and an exit access door (407.4.2)?