CBO BC Quiz 8, SIM and 2015 ICC IMC


Home Next Quiz

71. Who is required to inspect concrete footings supporting three stories of light frame construction?

HintSIM Pg. 77

72. Who is required to inspect concrete footings of 2,500 PSI concrete or less?

HintSim Pg. 77

73. Who inspects reinforced concrete footers (>2,500 PSI)?

HintSIM Pg. 77

74. Concrete and Shotcrete placement requires what kind of inspection?

HintSIM Pg. 78

75. Which of these require special inspections?

HintSIM Pg. 106

76. What percent of structural members need to be inspected for sprayed on fire-resistant material by the special inspector?

HintSIM Pg. 108

77. Which of the following is not a Special Inspector certificatied field?

HintSIM Pg. 11, App C

78. Which of the following is required for rough-in inspection of ducting?

Hint2015 IMC 107.2.2/span>

79. A heat exchanger designed to liquefy refrigerant vapor by removal of heat is a?

Hint2015 IMC 202

80. That part of the system in which liquid refrigerant is vaporized to produce refrigeration is the?

Hint2015 IMC 202