CBO BC Training IECC Quiz 12


Home Next Quiz

111. The coefficient of heat transmission (air-to-air) through a building component is?

Hint2015 IECC 202

112. What is the climate zone for Yuma County, Colorado?

Hint2015 IECC Table C301.1

113. Foundation insulation shall have how much protective cover?

Hint2015 IECC C303.2.1

114. What is the minimum R-value of wall insulation?

Hint2015 IECC C402.1.3

115. The window space shall be the designed window space, or what percent of the gross wall space as a maximum, whichever is smaller?

Hint2015 IECC C402.4.1

116. What is the maximum permissible air leakage rage of swinging doors in a commercial structure?

Hint2015 IECC C402.5.2

117. Thermostats controls shall have the capability to maintain zone temperatures between?

Hint2015 IECC C403.2.4.2.1

118. Pools covers are not required if more than _____ percent of the pool water heating energy comes from site recovered energy sources.

Hint2015 IECC C404.9.3

119. A 15,000 ft2 warehouse will require a maximum of how much power for lighting?

Hint2015 IECC Table C405.4.2(1)

120. Do changes in buildings require IECC compliance?

Hint2015 IECC C502.1, 503.1, 505.1